coach house update

I went by to see what had happened since yesterday afternoon.

The pressed tin doors and the plywood that covered them on the east wall have been removed and replaced with brick. New insulation has been installed.


On the south wall, the chimney has been removed. The landlady's sister had told me of this plan in the summer. The air conditioner has been removed and the hole bricked over. The window had been covered in plywood. The sill has been removed and the hole has been bricked in.



Perhaps these are the type of renovations for which one does not need a building permit.